Scheduled work ·
SEC1: acceptance test of the new perimeter flood barrier
-
Completed
The barrier passed its acceptance test. All seven gates deployed in 3 hours 52 minutes on this first attempt, and gates 1 and 2 held water to 19.5 ft with seepage inside the allowance.
-
Scheduled
The contractor will deploy all seven gates in the new SEC1 perimeter barrier for its acceptance test, and flood-test gates 1 and 2 against standing water. The south entrance will be closed for the morning.
Window
This notice affected
- SEC1 Secaucus: Flood protection (scheduled work)
- SEC1 Secaucus: Access and security (scheduled work)